General Contractor of Housing Industrialization in Iran

Posts in category Projects

Housing Industrialization Road Map an...

One of MAPSA’s biggest research projects was preparing Housing Industrialization Road Map of Iran (HIRMI) and also Housing Industrialization Strategic Plan . This road map have been prepared in 2010 and consists of 14 volumes and more than 2800 pages .

MAPSA Educational Seminars

MAPSA Company is not just a company. the educational aspect of MAPSA is one of it’s powers. MAPSA tried to teach professional engineers and engineering students in a broad diversity of inistitutions and universities across Iran since day one . MAPSA held more than 40 seminars between year 2009 and 2010 . the core concept of […]

MAPSA’s Phase 3 Project ( 1100 ...

Specifications : Project site area : 18.3 hectare Number of Apt. Buildings : 197 Number of housing units : 1100 Housing unit floor area : type 1 : 64 m2 type 2: 77 m2 type 3: 90 m2 Housing Density : 64/ha Number of Contractors : 22   Employed Technologies : Light Steel Frames : 79 Apt. Bldgs. Bolt and Nut Structures : […]

MAPSA’s Phase 5 Project ( 5400 ...

Specifications : Project site area : 75.5 hectare Number of Apt. Buildings : 790 3 story buildings : 728 7 story buildings : 62 Number of housing units : 5400 Housing unit floor area : type 1 : 84 m2 type 2: 76 m2 type 3: 71 m2 type 4: 64 m2 type 5: 59 m2 type 6: 120 m2 type 7: […]

MAPSA’s residential units proje...

MAPSA’s residential units projects in Prand New Town

In 1989 Parand New Town was laid out  a location 35 kilometers south of Tehran in order to absorb the expected overflow of population in Southwest Tehran. The comprehensive plan for this town was prepared in 1998 and approved by Iran’s Height Council of Architecture and Urban Development. This town is located in the vicinity of Imam Khomaini International […]

MAPSA History

MAPSA History

Iran’s housing demand for the next 15 years ( starting from 2010 ) is estimated  to be 14 million  units and the goal is to construct about one million housing unit per year . in order to supply the market with the anticipated demand , it was recognized early on , that the traditional method of construction is […]